CLS Health Plans $16.5M First Phase in Pearland

Exterior of an existing CLS Health clinic

CLS Health has plans for a new medical-office complex at 3225 Business Center Drive in Pearland, starting with a $16.5 million first phase. The state filing calls for a three-story, 66,000-square-foot shell building and supporting site improvements, with construction scheduled from October 30, 2026, through September 1, 2027.

The scope describes a property that will develop in phases. This initial project would establish the first building and key site infrastructure, giving the planned complex a starting point on Business Center Drive.

What the first CLS Health phase includes

Along with the sprinkler-equipped building shell, Phase 1 includes utilities, a detention pond, landscaping and parking lots. The filing identifies the shell as space for future tenant use. Interior medical suites and a tenant roster are not detailed in this registration.

Pearland Medical Center LLC is listed as the owner, with Mohammad J. Baba as its contact. Diamond Development Group of Houston is the listed design firm. The project is privately funded and registered under TABS2027001001.

The three-story building accounts for the 66,000 square feet in this filing. Later phases are referenced, but their sizes, costs and schedules are not provided.

CLS Health is already growing in Pearland

The Business Center Drive proposal follows another local milestone for the provider. In August 2026, CLS announced its Pearland East Comprehensive Care Center, describing primary care, specialty care, imaging and laboratory services in one location.

That operating center is a separate project. Its services help explain the company’s approach to coordinated care, but do not establish which specialties or diagnostic services will occupy the new Business Center Drive complex.

Conceptual laboratory illustration accompanying the CLS Health Pearland development story
AI-generated illustration of laboratory services. It does not depict the planned CLS Health Pearland facility or confirm its future services.

CLS also lists existing practices serving Pearland in its location directory. The proposed complex would add a new development to a city where the organization already has a presence.

A physician connection behind CLS Health’s plans

The owner contact named in the filing shares a direct connection to the medical group. Dr. Mohammad Baba’s official CLS profile identifies him as a pulmonary and critical-care physician practicing in Webster.

For Pearland residents, the immediate development news is the scale of the proposed first phase: a substantial medical-office building with infrastructure to support the site. The eventual tenant mix will determine the range of care available there.

CLS Health construction timeline

The filing schedules work to begin in late October 2026 and finish in September 2027. That completion estimate applies to the registered shell-building and site-work scope. A date for welcoming patients has not been confirmed.

The phased plan leaves room for a larger story as tenant finishouts and subsequent buildings become defined. For now, the $16.5 million first phase establishes the proposed complex’s initial footprint on Business Center Drive.

Read more Pearland Stories

Share this story