Nando’s Plans New Restaurant Buildout in Frisco

By

•

Nando's restaurant sign representing its planned Fields West location in Frisco

Nando’s is planning a $700,000 restaurant buildout at Fields West in Frisco, with a new state filing detailing work for a tenant already listed by the development.

The construction registration places the 2,537-square-foot restaurant at 5301 Fields Parkway, Suite A175. It describes first-generation tenant improvements, preparing the space for its initial restaurant use.

Nando’s buildout has an estimated 2027 schedule

The filing lists February 1 through June 9, 2027, as the proposed construction window. The $700,000 figure is an estimate for the tenant project, and the filed completion date is not a confirmed restaurant opening.

Fields West Propco is listed as the owner, with FHA Architects responsible for design. The registration does not detail seating, patio space or staffing.

A previously announced Fields West restaurant

Nando’s already appears on Fields West’s official tenant page and in its retail and dining directory. Those developer listings independently connect the restaurant brand to the Frisco development. The new filing adds the suite, project size and construction budget.

The restaurant’s official U.S. website identifies Nando’s with South African flame-grilled PERi-PERi chicken. That is the established brand concept, while the specific layout and opening plans for the Fields West restaurant have not been announced in the reviewed sources.

Part of the larger Fields West dining district

The developer describes Fields West as a 55-acre village within the broader 2,500-acre Fields development. Its plans include 380,000 square feet of retail and dining space.

The Nando’s project is one restaurant-sized piece of that larger commercial district. Its first-generation buildout would turn a designated tenant space into a dining destination at Fields Parkway, adding a more specific construction plan to the development’s announced restaurant lineup.

For readers tracking new restaurants in Frisco, the filing provides a more concrete milestone than a tenant announcement alone: a defined suite, estimated investment and proposed construction window. It does not establish when the public will be able to dine there. As with other proposed tenant improvements, construction schedules can change, and a restaurant’s opening depends on steps beyond the registered building work.

The project also illustrates how the larger Fields West development is moving toward individual storefront buildouts. While the broader district has its own retail and dining plans, this registration concerns Nando’s specific space, not construction of the entire development.

Read More Frisco Construction News

Share this story

MORE CONSTRUCTION NEWS NEARBY

View all Frisco news